Flue gas condensers

Biomass boilers
LPG and natural gas boilers
Cogeneration power plants
Flue gas condensers
Boiler repair

 

Client Object Fuel Capacity of boilers Project term
JSC "GECO Kaunas" Installation of new boiler-house and flue gas condenser (Kaunas) Wood chips 16 MW Executing
State Enterprise "Visagino energija" Installation of boiler-house and flue gas condenser (Visaginas) Wood chips 16 MW Executing
JSC "Vilniaus rafinavimo gamykla" Reconstruction of the existing stema boiler-house by installing a flue gas condenser (Vilnius) Natural gas 1,728 MW Executing
JSC "Plunges duona" Installation of a flue gas condenser on top of existing technical equipment (baking furnace) (Plunge) Natural gas 0,4 MW Executing
SC "Klaipėdos energija" Boiler plant reconstruction by installing condenser for hot-water boiler (Gargzdai) Natural gas 10 MW 2012
JSC "Manfula" Reconstruction of boiler-house by installing condenser steam boiler (Utena) Wood chips 10,7 MW 2012
JSC "Kretingos silumos tinklai" Reconstruction of boiler-house by installing condenser for tree hot-water boilers (Kretinga) Wood chips 10 MW 2012
SC "Siauliu energija" Reconstruction of boiler-house by installing condenser for hot-water boilers (Siauliai) Natural gas 100 MW 2011
JSC “Jonavos silumos tinklai” Boiler plant reconstruction by installing condenser for hot-water boiler (Jonava) Natural gas 18 MW 2011
JSC “Sirvintų siluma” Reconstruction of boiler-house by installing condenser for two hot-water boilers (Sirvintos) Wood chips 10 MW 2011
SC “Simega” Reconstruction of boiler-house by installing condenser for two hot-water boilers (Kupiskis) Wood chips 10 MW 2010
SC “Kauno energija” Reconstruction of Garliava RK by installing condenser for hot-water boilers (Garliava) Natural gas 9 MW and 5 MW 2010
JSC “Silutės silumos tinklai” Reconstruction of boiler-house by installing of condenser for four biomass boilers (Silute) Wood chips 24,5 MW 2010
JSC “Swedspan Giriu Bizonas” Reconstruction of boiler-house by, installing of economizer for hot-water boiler (Kazlu Ruda) Natural gas 3 MW 2009
SC “Kauno energija” Reconstruction of boiler plant in Raudondvaris by installing condenser for hot-water boilers (Kaunas) Natural gas 3 MW and 2x1,8 MW 2009
JSC “Radviliškio šiluma” Reconstruction of boiler-house by installing condenser for hot-water boiler (Radviliskis) Natural gas 4 MW 2009
JSC “Radviliskio siluma” Reconstruction of boiler-house by installing condenser for two hot-water boilers Wood chips 10 MW 2009
SC “Kauno energija“, branch JSC „Jurbarko silumos tinklai” Reconstruction of boiler-house by installing condenser for two hot-water boilers (Jurbarkas) photo » Natural gas  22 MW 2009
JSC “Mazeikiu silumos tinklai”  Reconstruction of boiler-house by installing condenser for two hot-water boilers (Mazeikiai)  photo » Natural gas 33 MW and 16 MW 2008
JSC “Ekotermijos“ servisas JSC “Moletu silumos tinklai”, reconstruction of boiler-house by installing condenser for two boilers (Moletai) Wood chips 9 MW 2008
JSC “Ekotermijos“ servisas JS “Panevezio energija”, reconstruction of boiler plant in Rokiskis by installing condenser for three boilers (Panevezys) photo » 
Wood chips 21 MW 2007
JSC “Ekotermijos“ servisas JSC “Taurages silumos tinklai”, reconstruction of boiler-house by installing condenser for two steam boilers (Taurage) Wood chips 20 MW 2007
SC “Kauno energija“ Reconstruction of Pergalės RK by installing condenser for hot-water boilers (Kaunas) Natural gas 2x9 MW 2007
JSC “Ekotermijos“ servisas JS “Snaige”, reconstruction of boiler-house by installing condenser for two hot-water boilers (Alytus) photo » Natural gas 6 MW 2007
SC “Grigiskės“ Reconstruction of boiler-house by installing condenser for the thermal oil boiler (Grigiskes) Natural gas 2,9 MW 2006
JSC “Ekotermijos“ servisas JSC “Joniskio energija”, reconstruction of boiler-house by installing condensers for the hot-water boilers (Joniskis) Natural gas 6,6 MW and 2,1 MW 2006
JSC “Ekotermijos“ servisas JSC “Plunges bioenergija”, cogeneration of power plant by installing condenser for steam boiler (Plunge) photo »  Wood chips  16,4 MW  2006
JSC “Ekotermijos“ servisas JSC “Mazeikiu silumos tinklai”, reconstruction of boiler-house by installing condenser for two hot-water boilers (Mazeikiai)  Wood chips  18,3 MW   2006
JSC “Ekotermijos“ servisas JSC “Utenos silumos tinklai”, reconstruction of boiler-house by installing condenser for hot-water boilers (Utena)  Natural gas  21 MW  2004
JSC “Ekotermijos“ servisas JSC “Utenos silumos tinklai”, reconstruction of boiler-house by installing condenser for steam boiler (Utena)  Wood chips  10 MW  2004
JSC “Ekotermijos“ servisas JSC “Pajurio mediena”, reconstruction of boiler-house by installing condenser for two steam boilers (Klaipeda) Wood chips  18 MW  2003